Windfarm: Thornton BankCountry: Belgium Location: West of Zeebrugge Total Capacity: 300 MW (Phase I: 30 MW) Number of Turbines: 60 Distance to Shore: 27 km Depth: 29 m Capital Costs: 850 MEuro (Phase I: 158 MEuro) Cost of Energy: Image: Status: Consent obtained Construction Date: 2008 (Phase I: 6 units) Manufacturer: REpower Total Capacity: 5 MW Turbine-type: 5M Mean Windspeed: Annual Energy output: 987 GWh Windfarm Developer: C-Power Website click here |