Windfarm: Thornton Bank


Country: Belgium
Location: West of Zeebrugge
Total Capacity: 300 MW (Phase I: 30 MW)
Number of Turbines: 60
Distance to Shore: 27 km
Depth: 29 m
Capital Costs: 850 MEuro (Phase I: 158 MEuro)
Cost of Energy:
Image:
Status: Consent obtained
Construction Date: 2008 (Phase I: 6 units)
Manufacturer: REpower
Total Capacity: 5 MW
Turbine-type: 5M
Mean Windspeed:
Annual Energy output: 987 GWh
Windfarm Developer: C-Power
Website click here

Location windfarm

back to map