Windfarm: Yttre StengrundCountry: Sweden Location: Off mainland coast, south of Oland Island Total Capacity: 10 MW Number of Turbines: 5 Distance to Shore: 5km Depth: 6-10 m Capital Costs: 13 million Euro Cost of Energy: Image: Status: In operation Construction Date: 2001 Manufacturer: NEG-Micon Total Capacity: 2 MW Turbine-type: 72 m rotor diameter, 60 m hub, pitch regulated Mean Windspeed: 8.47 m/s a Annual Energy output: 30 GWh/y Windfarm Developer: Vindkompaniet Website click here |