Windfarm: Nysted


Country: Denmark
Location: Baltic Sea
Total Capacity: 165.6 (limited to 158.4 MW)
Number of Turbines: 72
Distance to Shore: 10 km
Depth: 5 - 9.5 m
Capital Costs: 270 million Euro
Cost of Energy:
Image:
Status: Operational
Construction Date: 2003
Manufacturer: Bonus
Total Capacity: 2.3 MW
Turbine-type: 82 m rotor
Mean Windspeed: 9.1 m/s at 69 m hub height
Annual Energy output: 595 GWh/y
Windfarm Developer: Elsam/Elkraft/Energy E2
Website click here

Location windfarm

back to map
Webcontent © 2002 www.offshorewindenergy.org
Updated September 2008